Solid Waste Ordinance TO.03.014 - Addendum I, page 3
As of January 1, 2018, per vote of the New Durham Board of Selectmen:
Disposal of C&D Materials
For the disposal of the following materials:
• Contractors and businesses shall show a copy of a New Durham Building Permit, and the homeowner’s facility use decal number proving the source of Construction & Demolition Debris or Sheetrock and Shingles.
• A limit of 4 cubic yards per permit.
Contractors, businesses and home remodeling generating more than 4 cubic yards of Construction & Demolition Debris or Sheetrock and Shingles are asked to use a waste removal service to dispose of their materials.
Construction & Demolition Debris *
Is assessed a fee of $1.00/cubic foot/$0.08/lb weighed on floor scale (Rate is consistent with rate for truck load or cubic foot)
Includes: Painted, unpainted wood, carpets & rugs etc.
For:
Pickup Trucks with 6 foot bed $40.00
Pickup Trucks with 8 foot bed $50.00
Cab & Chassis Truck with platform
and/or dump cart beds, not to exceed
17,500 GVW $60.00
Note: Loads exceeding the height of the manufactures’ truck bed will be charged an additional fee, at $1.00/ cubic foot. Platform beds with manufactures rack style body will be assessed at the cubic foot rate.
Shingles or Sheetrock *
Is assessed a fee of $2.00/cubic foot/$0.08/lb weighed on floor scale (Rate is consistent with rate for truck load or cubic foot)
Shingles must been separated from all other debris. *
For:
Pickup Trucks with 6 foot bed $80.00
Pickup Trucks with 8 foot bed $100.00
Cab & Chassis Truck with platform
and/or dump cart beds, not to exceed
17,500 GVW $120.00
Note: Loads exceeding the height of the manufactures’ truck bed will be charged an additional fee, at $2.00/ cubic foot. Platform beds with manufactures rack style body will be assessed at the cubic foot rate.
*- Fees assessed to be determined by the Solid Waste Attendant, for less than full truck loads.